Page 193 - booklet draft
P. 193
Sr DSO inspection at CVV 3 line Sr DSO Inspection at SNF running room
rd
works on 21.09.22 on 24.09.22
Sr DSO inspection at ART/MRV/SC on 08.10.22
DRM interaction with local Supervisors DRM interaction with RJCS/UTCM
at MQR PF on 28.09.22 siding officials on 28.09.22
DRM & Sr DSO inspection at MQR Bridge No.123 in between VKB-CTF
station on 28.10.22 inspection by DRM/SC