Page 193 - booklet draft
P. 193

Sr DSO  inspection at CVV 3  line           Sr DSO Inspection at SNF running room
                                                rd
                           works on 21.09.22                                  on 24.09.22



















               Sr DSO inspection at ART/MRV/SC on 08.10.22























                DRM interaction with local Supervisors           DRM interaction with RJCS/UTCM
                         at MQR PF  on 28.09.22                       siding officials  on 28.09.22
























               DRM  &  Sr  DSO  inspection  at  MQR           Bridge  No.123  in  between  VKB-CTF
               station on 28.10.22                            inspection by DRM/SC
   188   189   190   191   192   193   194   195   196   197   198