Page 198 - booklet draft
P. 198
excess blast
heaps at rail
level which
may be the
cause of
derailment.
4 On 25.10.2020 Out of 3 shunting Primary:
at about 17.37 staff, Sri Md Rafi K Madhu, R/P by one stage
hrs, while was in loco, Sri A SHM/KZJ. for period of 01
pushing the LHB Suman was in the year(NC)
coaching middle of the
empty rake formation and Sri K
consisting of 22 Madhu, SHM was in
coaches for rear of the
stabling at formation and
washing line-1 continuously
& 2 in two instructing shunter
portions, rear and loco points
coach No. SC man to back the
LDSLRA 201840 formation through
hit the buffer walkie talkie. At the
stop of washing time of rear coach
line-1 and approaching buffer
derailed all stop, the walkie
wheels of rear talkie
trolley and front communication
trolley one pair failed between
of wheels due rear SHM and
to rear PM shunter/leading
failed stop the PM, resulted rear
formation while SLR(LHB) bumped
approaching dead end and
rear coach to derailed.
buffer stop. Casualties: Nil
Cost of damages:
Nil
Committee: TI/KZJ,
SSE/C&W/KZJ,
SSE/P Way/CR/KZJ,
CLI/KZJ