passing at a the SPAD. three years where
distance of about Casualties - Nil the period of
403 mts. Starter Cost of damages - reduction shall
Signal S-19 was in Nil operate to
danger aspect postpone future
because 02621 Committee: Sr increments of pay
Tamilnadu Exp DME/Co, Sr DSO, & loss of seniority
was given through Sr DSTE & Stn
signals at Bypass Director/SC
line from WL
direction and
passed Bypass
cabin at 09.20 hrs
and section (KMTP
station) cleared at
09.27 hrs
2. Yard accidents and Other train incidents: 04
Sl Cause, Casualties,
No Brief description Cost of damages &
of accident & Committee Responsibility Status/Penalty
Cause imposed
1 On 05.05.2020 Cause: Primary:
at 12.15 hrs, During forward Sri. Md Umar, Reduction of pay
during shunting movement from M3 shunting by one stage for a
of 8 BCN line towards SC Master /KZJ & period of 06 months
wagons from end Pt No. 24 not (NC)
M3 to M2 line at set in favour of the
KZJ marshalling movement resulted Reduction of pay
yard Pt No.24 trail through the Sri. B.Shanker, by one stage for a
was not set point and while PM/KZJ period of 06 months
properly, during backing on the (NC)
forward same point 6th
movement Pt wagon taken two Secondary: Withholding of
No.24 trail route and 5th Sri B Srinivasa Annual increment
through and wagon from Rao,Sr shunter for one year
while backing engine front trolley /KZJ without cumulative
on the same got derailed. effect.
point 6th Casualties: Nil
wagon from Cost of damages:
loco taken two Nil
routes and 5th Committee:
wagon front TI/KZJ, SSE/Pway/
trolley derailed CR/KZJ,CLI/KZJ,
on point. SSE/S&T/RRI/KZJ &
SSE/C&W/KZJ.