P. 196

passing    at  a  the SPAD.                                        three  years  where
                   distance  of  about Casualties - Nil                               the     period      of
                   403  mts.  Starter  Cost of damages -                              reduction        shall
                   Signal  S-19  was  in  Nil                                         operate            to
                   danger        aspect                                               postpone       future
                   because         02621  Committee:           Sr                     increments of pay
                   Tamilnadu         Exp  DME/Co,  Sr  DSO,                           & loss of seniority
                   was given through  Sr        DSTE     &    Stn
                   signals  at  Bypass  Director/SC
                   line     from      WL
                   direction        and
                   passed        Bypass
                   cabin  at  09.20  hrs
                   and section (KMTP
                   station) cleared at
                   09.27 hrs


               2. Yard accidents and Other train incidents: 04

              Sl                        Cause,  Casualties,
              No Brief description  Cost of damages  &
                   of  accident  &  Committee                     Responsibility     Status/Penalty
                   Cause                                                             imposed
              1    On     05.05.2020  Cause:                      Primary:
                   at    12.15    hrs,  During        forward  Sri. Md Umar,         Reduction  of  pay
                   during  shunting  movement from M3  shunting                      by  one  stage  for  a
                   of      8     BCN  line      towards     SC  Master /KZJ &        period of 06 months
                   wagons        from  end Pt  No.  24  not                          (NC)
                   M3 to M2 line at  set  in  favour  of  the
                   KZJ  marshalling  movement  resulted                              Reduction  of  pay
                   yard  Pt  No.24  trail  through  the  Sri. B.Shanker,             by  one  stage  for  a
                   was     not     set  point    and     while  PM/KZJ               period of 06 months
                   properly,  during  backing        on     the                      (NC)
                   forward              same      point     6th
                   movement         Pt  wagon  taken  two  Secondary:                Withholding          of
                   No.24          trail  route     and      5th  Sri  B  Srinivasa  Annual      increment
                   through       and  wagon               from  Rao,Sr  shunter  for         one       year
                   while     backing  engine  front  trolley  /KZJ                   without  cumulative
                   on  the  same  got derailed.                                      effect.
                   point          6th  Casualties:  Nil
                   wagon         from  Cost  of  damages:
                   loco  taken  two  Nil
                   routes  and  5th  Committee:
                   wagon         front  TI/KZJ,    SSE/Pway/
                   trolley  derailed  CR/KZJ,CLI/KZJ,
                   on point.            SSE/S&T/RRI/KZJ       &
                                        SSE/C&W/KZJ.