Page 30 - booklet draft
P. 30

2. Test Bench for Electro Pneumatic Contactors
               DLS/KZJ  has  started  TOH/IOH  schedule  attention  of  WAG7  electric
               locomotives from July-2020 onwards. A test bench is fabricated to test
               the  Line  contactors,  shunt  contactors  &C145 during  TOH  &  IOH
               schedules.  On  this  test  bench,  3  EP  contactors  can  be  tested
               simultaneously.  This  test  bench  is  used  to  measure  pick  up  voltage
               and  drop  out  voltage.  This  test  bench  is  also  used  to  test  magnet
               valves.
   25   26   27   28   29   30   31   32   33   34   35