6.Mechanical(DLS-KZJ)




                   1. SYSTEM IMPROVEMENTS
                    1. Test Stand for Pantograph Plunger Box Assembly
                 WAG-7  electric  locos  are  fitted  with  AM-12 type pantograph.
                 Plunger box assembly is a critical component of Pantograph. After
                 overhaul  of  plunger  box  assembly,  the  same  is  fitted  on  the
                 pantograph assembly and testing is done. If any defect is noticed,
                 it is removed, overhauled and re-fitted on pantograph. Hence to
                 avoid  testing  on  pantograph,  a  test  stand  is  designed  and
                 fabricated for testing of PLUNGER BOX ASSEMBLY. This reduces the
                 time of re-work and also spare plunger box assemblies are made

                 ready, before fitment on pantograph.