Page 24 - booklet draft
P. 24

SNF                   272               SNF- DKJ- 4+1
                                                                           KZJ-BPQ -72
                                   KZJ                   161
                                                                           BPQ-SNF - 32


                       Easing  out  constraints  in  WADI  interchange  in  coordination  with
                       SUR  division to improve sectional speed:


                          SC crew working till ACC/WADI and vice versa there by decongesting
                          SC-WADI section. This enabled smoother WADI-SUH interchange.
                          Average  speed  of  SC  – WADI  Section  and  average  handing  over
                          detention at WADI
                                    Month           Avg. Speed         Detention

                                    Jul                   10.36              02:00
                                    Aug                   11.56              02:23
                                    SEP                   11.47              02:20
                                    Oct                   13.76              01:46


                       Crew links review


                          Coaching  crew  links  are  revised  enabling  a  reduction  of  16  men
                          requirement  for  express  trains  and  resultant  relief in  crew  for  goods
                          operations.
                          By reviewing guard’s link a net reduction of 34 guards was achieved.



                       GLP Check in 45 minutes:
                          GLP Check by LP & TM should be completed within 45 minutes.
                          In OCT-22, 220 GLP checks are done at an average of 31 minutes
                       Rolling stock speed improvements

                          Processing for increasing wagon speeds where JSC speeds are less than
                          that of wagon permitted speeds.
                          A  total  of  40  type  wagons  were  identified  and  letter  was  sent  to
                          Sr.DEN/CO-ord  /SC  to  enhance  the  speeds  over  30  sections of  SC
                          division
                          (Annexure Enclosed)

                          Increasing  the  speeds  of  11  different  track maintenance  machines  to
                          RDSO/IRTMM permitted speeds is under process
                          (Annexure Enclosed)


               i.   Coaching:


                          334 Numberr of VPU/VPH ‘s (Indent) were attached to various trains, in
                          addtion  to  leased  VPU/VPH’s  up  to  October  – 22  and  earned  an
                          revenue of Rs.4.93crores
                          On day to day basis, to clear extra rush of passengers, 632 additional
                          coaches were attached as extra rush, 538 coaches were augmented.