Page 277 - Tech handbook 2019 rev 6 whyperlinks
P. 277
TECH-A AUDIT OUTLINE
Some sections will be redundant from the previous audit to confirm skills. The panel will grade each
section, and grades will be discussed during the completion of the examination.
NOTE: A score of 2.5 is required for level certification. Tech A must present extreme professionalize,
writing, and verbal skills and show the skills required to lead a project.
• MYPLANT
o log into myPlant remote
o save current parameters
o use the diagnostic workbench to trend issue
• DIANE
o Load Diane software on XT3 and XT4
o Load parameters
o Connect to different components
o Copy software and parameters from components, AVR, Mains Monitoring
Device, VFD…. ETC
• PERFORM TASKS
o Investigate component failure
o Diagnose component
o Perform minor overhaul tasks
o Troubleshoot simple circuit
o Diagnose software glitch
o Perform and correct alignment
o Collect data
• COMMUNICATIONS
o Continually keep panel up to date with progress
o Explain data collected
o Explain to panel issue that leads to failure
• DOCUMENTATION
o Finalize project documentation
o Explain documentation to panel
o Submit documentation to management
o Document potential work to quote
Revision: 2, November 2019
©Copyright 2019 Penn Power Group, LLC – All Rights Reserved