1c
                                                •  Keeping the tape measure flat on the frame rail and
                                                horizontal capture your reading making sure you take the
                                                reading while level with the tape measure.  Repeat this
                                                process at each required rail location.
















                          Measurement After Settling Before Initial Alignment

                              After Jenbacher recommended settling period of 24 to 48 hours and prior to
                              alignment procedure rails should be measured as shown in 1.3 again.  If
                              measurements are out of the ordinary in anyway or +/- 2mm from previous
                              reading a picture showing the location and measurement method is required for
                              documenting to Jenbacher.

                              *Once rails are documented alignment can be performed per Jenbacher
                          documentation



               Checking Installed Rubber Rails


                          Repeating Rubber Rail measurement

                              During each alignment process and 2000-hour maintenance rubber rail
                              measurement should be documented using the WES/NES data capture sheet as
                              described in 1.3

                              During the rubber rail measurement hardware should be checked for tightness,
                              wear or damage.  Special care should be taken to inspect all hardware
                              connecting frame rails, gearbox, rubber rails and couplings.