DESIGN-BUILD PROCESS STEPS


      The design-build process can be broken down into  the project is still in the design phase. Ultimately,
      five main steps: team selection, project planning,       it will depend on your specific project and your
      design, GMP/bidding, and construction. For the           goals.
      most part, these steps will happen sequentially, but
      not necessarily independent of one another. The          Each step in the process will typically include the
      project planning, design, and bidding phases may         following:
      overlap. Construction may kick off while some of

































      1. Team Selection


      During the team selection phase, the owner will          Regardless, these teams will band together
      choose the firms that will make up their design-         contractually to form your design-build team. The
      build team. This often includes the builder,             success of the entire project will be their goal,
      architect, and engineers.                                as opposed to the success of just their area of
                                                               expertise. This motivates them to work together
      Depending on the owner’s preference, they will           from the start, looking at the big-picture success of
      either select one firm who will then choose the          the project.
      other members of the design-build team, or the
      owner will play an active role in the selection of all
      the firms that make up the team.

      2. Project Planning


      Once the design-build team is assembled, they’ll         the project’s site and any existing structures or
      begin to plan out the project. They’ll match up          utilities located on the site, and they’ll look for
      your vision and goals for the project with your          potential challenges so they can prepare and plan
      budget, and develop preliminary drawings,                accordingly.
      cost analyses, and schedules. They’ll analyze