3. Design Phase

      Once the preliminary drawings fit into the rest of        architect, builder, and any specialty subcontractors
      the project plan, the design phase begins. This is        during this stage. This will lead to more accurate
      when the architect will complete the final drawings       drawings, reducing the risk of constructability
      for the project.                                          issues and change orders down the road.

      Unlike with the design-bid-build project approach,
      your project will benefit from the input of the



      4. Establishing a GMP


      Next, the builder will assemble a more defined            In addition, your project will be secured with a
      cost for the project. At Horst Construction, this         GMP. A GMP is a set price for the project backed
      includes at least 3 - 5 bids for each trade package       by the design-builder. It’s a promise that the
      and a guaranteed maximum price (GMP).                     project’s cost won’t go above that specific price. If
                                                                it does, it’s the responsibility of the design-builder
      A common concern with the design-build                    to pay—not the owner.
      approach is that a project will cost more because
      the work won’t be competitively bid. However,             All Horst Construction design-build projects will
      that’s not the case. We make sure to get viable           put trade packages out to bid and include a GMP.
      bids from trusted, quality subcontractors, so you         But this won’t be the case with all design-build
      can be sure you’re getting a fair price.                  teams. We believe this is the best way to ensure
                                                                the owner gets the fairest price for their project.


      5. Construction

      As the design is finalized and the subcontractors         However, there is always the potential for
      and suppliers are selected, construction will begin.      unforeseen challenges to arise. But because the
      Because of the early collaboration on the part of         project rests on a solid plan from the beginning,
      the project team, the project should go smoothly.         the team will have more bandwidth to deal with
                                                                challenges as they occur.
      The design-build approach has been shown to
      reduce or even eliminate the need for change              Once construction wraps up, the project will
      orders, keeping costs in line with the budget.            close out and the owner can move into their new
                                                                building!





      EXAMPLE OF A DESIGN-BUILD PROJECT

      Spurred on by the collaborative approach it offers,      Once they chose their team of Horst Construction,
      Lancaster Bible College chose the design-build           Cornerstone Design Architects, and Providence
      project delivery method for the construction             Engineering, the project preconstruction and
      of the new Teague Learning Commons. Upon                 design phase kicked off. And because these key
      completion, this 41,500-square-foot building             players could all bring their unique expertise to the
      spans three stories and serves as the campus’s           table in the planning phase, the project was better
      collaborative learning and research hub.                 off.