CLIENT
                            Rockford SD 205  Additions Expand Health

                     CLIENT CONTACT INFO
                            Mr. Ehren Jerrett   and Wellness Programs
                            Superintendent
                              815.966.3101
                     ehren.jarrett@rps205.com  THREE FIELD HOUSE ADDITIONS
                            PROJECT COST
                  Auburn: $14.1M (e) $13.7M (a)
                  Guildford: $8.4M (e) $8.6M (a)   FGM Architects, as a design partner to Hagney Architects, was
                  East HS: $13.5M (e) $13.9M (a)  selected by Rockford School District 205 to design a field house
                                             for Auburn, Guilford, and East High Schools.
                               SCHEDULE
                           Completed: 2015
                                             AUBURN HIGH SCHOOL’s $13.7M field house is 107,000 sf. The
                       ADDRESS OF OFFICE     project features a 200-meter, 58,000 sf track field house,
                 RESPONSIBLE FOR SERVICES     a multi-purpose physical education space, a weight room, athletic
                          nd
                1211 West 22  Street, Suite 700   locker rooms, and eight classrooms. The field house also includes
                      Oak Brook, Illinois 60523
                                             an expanded cafeteria and relocated athletic director offices. A
               % OF SELF-PERFORMED WORK      dramatic new entryway and lobby welcomes visitors and allows
                                    35%
                                             them to enter the space without having to access the school itself.
                                             GUILFORD HIGH SCHOOL’s $8.6M field house is 55,300 sf.
                                             The precast building with the brick façade includes a four-lane,
                                             172-meter track, three basketball and volleyball courts, batting
                                             cages, a weightlifting room, concessions space, facilities for
                                             athletic trainers and the office for the director of athletics.

                                             EAST HIGH SCHOOL’s $13.9M project included an addition
                                             onto a historic building, modifying and renovating the location
                                             of student support services spaces and rebuilding administrative
                                             spaces to add a new entry close to staff parking lots.