Page 95 - FINAL Combined CB2_Neat
P. 95

Morton East HS Renovations
               Priorities  being  addressed  at  the  East  Campus  include:  the  re-establishment  of  the  main
               entrance to the high school on Austin Avenue, the reorganization of administrative and student
               support services to improve customer service, the reinvention of the library as a collaborative
               learning environment and building infrastructure improvements.

               The re-establishment of the original front door and administrative and student support services
               renovations improve accessibility; improve security, operations and administration, and improve
               customer service by locating functions with a high degree of parent interaction close to the
               front door and functions with a high degree of student access located in proximity to the student
               areas.  The  first  floor  will  include  a  new  2-story  secure  entry  lobby  with  operations  and
               conferencing.  The  existing  health  clinic,  currently  located  on  the  2nd  floor  adjacent  to  the
               school nurse’s office, will be relocated to the ground floor to provide direct exterior access for
               visitors. Deans and Assistant Principal offices will be located on the 2nd floor while the 3rd floor
               will be home to guidance counselors with an adjacent career center. The principal’s office will
               be on the 4th floor. Site work for this project will include the addition of visitor parking spaces,
               new sidewalks and ramps to access the entry.

               The  renovation  of the  existing  library  into  a  student  centered  multi-media  collaboration  and
               production center incorporate additional space from underutilized and vacated space on the
               third floor. The layout and architectural character respects the grand libraries of the past while
               creating an energized space for student collaboration. The main third floor entry leads into a
               great reading hall with smaller reading spaces and is a quiet study floor that will house all book
               collections with areas for students to study individually or in small groups. The 3rd floor will include
               a career center adjacent to the new guidance counselor offices. The 2nd floor of the library is
               the active, collaborative space. It will be connected to the 3rd floor with an amphitheater/open
               staircase that can accommodate student presentations or function as a casual collaboration
               space. The remaining areas of the 2nd floor will include a digital media area, maker space and
               various group study rooms.  A genius bar will allow students to troubleshoot technical device
               issues with their peers. An A/V office and equipment storage room will support technological
               needs. Rooms requiring noise control will have glass walls to separate the space acoustically,
               but still allow for supervision.

               FGM assisted District 201 in obtaining Health Life Safety amendments to upgrade the antiquated
               heating system to an energy efficient HVAC system. New units will reduce noise and increase
               climate control to upgrade the learning environment. The upgrades will also include a refresh
               of the classroom finishes including new carpet, vinyl floor tile, ceilings and wall finishes. Many of
               the existing light fixtures will be replaced with LED fixtures which significantly reduce energy and
               maintenance costs. FGM is also working with the district in selecting furniture, furnishings, and
               equipment. The furniture, along with the technology, will allow the refreshed classrooms to be
               more flexible, student-centric, and technology-friendly.

               The project is scheduled for completion in August 2019.
   90   91   92   93   94   95   96   97   98   99   100