VSP 2018 Construction Guidelines



                       22.13.6  Indicator and Alarm
                                Install a low-range salinity indicator, operating temperature indicator,
                                automatic discharge to waste system, and alarm with trip setting on water
                                production equipment.

                       22.13.7  High-Saline Discharge
                                If routed for discharge, direct high-saline discharge from evaporators to the
                                bilge or overboard through an AIR GAP or RP ASSEMBLY.

                   22.14  Halogenation
                          Locate storage areas of salt used to generate chlorine for potable water close to the
                          chlorine production plant. Construct storage areas to dry food storage standards.

                       22.14.1  Bunkering and Production

                          22.14.1.1     Backflow Prevention
                                        Provide POTABLE WATER taps with appropriate BACKFLOW
                                        prevention at the HALOGEN supply tanks.


                          22.14.1.2     Halogen Injection
                                        Control HALOGEN injection by a flow meter or an analyzer with a
                                        sample point located at least 3 meters (10 feet) downstream of the
                                        HALOGEN injection point. Installed analyzers must have a sample
                                        point to calibrate the analyzer.

                                        A static mixer may be used to reduce the distance between the
                                        HALOGEN injection point and the sample cock or HALOGEN
                                        analyzer sample point. Ensure that the mixer is installed per the
                                        manufacturer’s recommendation. Provide all manufacturers’ literature
                                        for installation, operation, and maintenance.

                          22.14.1.3     pH Adjustment
                                        Provide automatic PH adjustment equipment for water bunkering and
                                        production. Install analyzer, controller, and dosing pumps that are
                                        designed to accommodate changes in flow rates.

                       22.14.2  Distribution

                          22.14.2.1     Sample Point
                                        Provide an analyzer controlled, automatic HALOGENATION system.
                                        Install the analyzer probe sample point at least 3 meters (10 feet)
                                        downstream of the HALOGEN injection point. The analyzer must have
                                        a sample point for calibration.

                                        A static mixer may be used to reduce the distance between the
                                        HALOGEN injection point and the HALOGEN analyzer sample point.
                                        Ensure the static mixer is installed per the manufacturer’s