Page 24 - NSRI_ORC140 USER MANUAL
P. 24

Deep water recovery:

         o  Crew person to be at anchor locker to recover rope.
         o  Collect windlass controller and handle.
         o  Ensure the brake is tight.
         o  Remove anchor chain lock.
         o  Connect windlass controller.
         o  On the command of the Coxswain, commence recovery of anchor.
         o  Undo rope from cleat.
         o  Give the rope two turns around the rope drum on the windlass.
         o  Winch in until splice portion of rope is at rope drum.
         o  Attach chain strop.
         o  Release load onto the chain strop.
         o  Transfer chain onto gypsy wheel.
         o  Ensure two chain links in gypsy wheel.
         o  Take up the load.
         o  Remove anchor chain strop.
         o  Winch until the swivel of the anchor is on the bow roller and stop.
         o  Slowly edge the anchor stock into the slide by intermittent controller operations.
         o  Once the anchor is completely in the slide, stop.
         o  Remove locking pin from the slide.
         o  Winch the slide back slowly and refit locking pin.
         o  Slack chain.
         o  Lock down anchor latch.
         o  Release brake to allow chain to line up with cover plate.
         o  Remove controller and place plug cap back on windlass.

      Note:
       •  On return to base, wash anchor chain with freshwater at the anchor locker, drain water to bilge,
       clean out and dry.
      •  Spray plug on windlass with corrosion guard to prevent corrosion.


































          23
   19   20   21   22   23   24   25   26   27   28   29