Page 7 - KGFC - Mid Season Update - July 2020
P. 7

ON COURSE



       UPGRADES






        As part of our “Phase 1 Stabilisation & Foundation” process, we identified some areas of the golf course and
        machinery that required upgrading. Over the winter period, we completed the following.


             KILLEEN COURSE





               1 ST    Problematic high & low points on green and surrounds addressed through a slight redesign.



               2  ND   Reduced height of rhododendrons from tee box & re-routed pathway. Re-shaped the mounds
                       on fairway & greenside to expose bunkers. Remove pathway & stream, re-sodded as required.


               4 TH    Plant silver birch to supplement spinneys.



               6 TH    Drain & tidy area beside tee-box. Plant silver birch.



               7 TH    Plant silver birch to supplement spinney.



               8 TH    Address damaged bridge, re-shape right side of ladies’ tee-box, drain & re-sod areas both
                       sides of greenside drain.

               9 TH    Drain & seed area beyond ladies’ tee-box. Crown lift area on left of tee box.




               11  TH  Remove fencing around spinneys.


               13  TH  Replace damaged bridge.




               18  TH  Mound & plant area beyond tee boxes.




             ADDITIONAL ITEMS


                       All fairways re-shaped.


                       New trees planted.


                       Dead trees removed.




        MANAGEMENT COUNCIL UPDATE | JULY 2020                                                                 7
   2   3   4   5   6   7   8   9   10   11   12