Page 13 - CORE Solar Energy Brochure
P. 13

SOLAR ENERGY EXPERIENCE




























                         AMPHITHEATER PUBLIC SCHOOLS DISTRICT PHOTOVOLTAIC SOLAR ARRAY



                         The Photovoltaic Solar Array project at Amphitheater Public Schools District included   Construction of the roof mounted solar arrays consisted of ballasted and pitched
                         the new construction of 9,443 kilowatt roof and ground mounted photovoltaic   standing seam installations while the ground mounted arrays were built on drilled
                         solar arrays for 25 school campuses in the Amphitheater Public Schools District   caisson  foundations.  Due  to  CORE’s  energy  efficient  construction  efforts,  the
                         located in Tucson, Arizona. The solar panels function as a renewable energy power   Photovoltaic Solar Array project at Amphitheater Public Schools District project
                         source  by  converting  solar  energy  from  direct  current  into  alternating  current   meets  the  needs  of  the  school  district  in  reducing  power  costs  per  school  by
                         for the distribution of electrical energy as well as providing shade to students.   generating an estimated 60% of the school District’s electricity needs overall.



























                                                                                                                                       CORE Construction  11
   8   9   10   11   12   13   14   15   16   17   18