                   Cost plus target fee

                   The use of this method required a target fee to be set for the project prior to the signing

                   of the contract. Have incentive factor to contractor to reduce or minimize project cost if
                   the actual cost is lower than targeted cost.


                   However  if  the  actual  cost  is  higher  than  targeted  cost,  contractor  payment  will  be

                   deducted based on the agreed fee/percentage















































                                       Table 3.4:  Calculation of Cost Plus Target Fee