5.2.2  Abnormal costs

               As set out in both the Melanie Dwyer report,  and the D and S report, an
               allowance of £150,000 for demolition of existing structures appears to be
               agreed.

               There will also be site clearance costs (see HCA Guidance on Dereliction,
               Remediation  and  Demolition  Costs,  2015)  which  could  amount  to  an
               additional £100,000 for this site, looking at the benchmarks.


               5.2.3 Other development costs

               Added to these costs will need to be other development costs.  These are
               set out in the screenshot below:

               I have taken variables at standard Toolkit defaults in most instances:


























               I  note  that  Dixon  and  Searle  consider  a  margin  at  17.5%  on  GDV  is
               appropriate.  I would respond by stating that the current Toolkits operating
               across the UK are set up at 20% as standard.  It is correct to say that these
               have in the past had lower margins as a default, but this happened at times
               where the market cycle was much more favourable than it is currently.

               The purpose of the margin is in some measure, to reflect the degree of risk.

               It is also to reflect realistic lending criteria and I understand, in this respect,
               that  the  applicants  will  not  get  support  from  a  bank  at  a  return  on  the
               scheme of less than 20% on GDV.