Page 27 - COLLAGE
P. 27

3.15. INVASION OF IRAQ


                    The United States Army's 299th Multi-role Bridge Company, USAR deployed a Standard
                    Ribbon Bridge across the Euphrates River at Objective Peach near Al Musayib on the night

                    of 3 April 2003. The 185-meter bridge was built to support retrograde operations because

                    of the heavy-armor traffic crossing a partially destroyed adjacent highway span.

                    "By dawn on 4 April 2003, the 299th Engineer Company had emplaced a 185-meter long
                    Assault  Float  Bridge—the  first  time  in  history  that  a  bridge  of  its  type  was  built  in

                    combat." This took place during the 2003 invasion of Iraq by American and British forces.

                    That  same  night,  the  299th  also  constructed  a  40-metre  (130  ft)  single-story  Medium
                    Girder  Bridge to  patch the damage done to  the highway span. The 299th was  part of

                    the U.S. Army's 3rd Infantry Division as they crossed the border into Iraq on 20 March
                    2003.



















































                                                           27
   22   23   24   25   26   27   28   29   30   31   32