7.0  Conclusions and Recommendations


               7.1  Conclusions

               After  careful  consideration  of  all  the  design  information,  operational  scenarios,
               operator  competencies  and  historical  quantative  data  it  is  concluded  that  the
               immersion  rigs  and  equipment  have  been  manufactured,  fitted  out  and  tested
               successfully that they are "Functionally Fit  For Purpose". The Design, Functionality
               and Operation Safety  Case as reported in this document has been produced with
               sufficient  rigour  to  enable  it  to  stand  as  the  evidence  to  state  that  "THE  DESIGN
               AND FUNCTIONAL SAFETY OF THESE RIGS CAN BE JUSTIFIED".


               7.2  Recommendations


               1)      It is recommended that the build quality, fitting out, system architecture and
               testing is surveyed, witnessed and signed for by a "Competent Person".

               2)      It  is  also  further  recommended  that  a  maintenance  plan  and  schedule  is
               produced and promulgated such that the maintenance, or lack of maintenance can
               also  be  visible  and  reported  against  at  the  two  annual  meetings  of  the  Osprey
               Rescue Team Ltd.