Page 22 - Osprey Binder
P. 22
Annex 1 - Safety Management
The Osprey Rescue Team Ltd. employs the following Safety Management System
and the processes involved. These are detailed in this annex. The attendant Hazard
Log is also shown at Annex 2.
Safety Management System:
Step 1: Preliminary Hazard Identification
Step 2: Populate Hazard Log with Step 1 hazards (Preliminary Hazard List (PHL))
Step 3: Analyse Hazards for a) Impact (consequence)
b) Likelihood of occurrence (probability)
Step 4: Update Hazard Log with results of Step 3 to provide Risk status (PxI)
Step 5: Analyse Risk status against the agreed Matrices to provide Acceptance of
Hazard Risk or otherwise.
Step 6: Provide mitigation for unacceptable Hazards to reduce the Risk level.
Step 7: Repeat Step 5 for mitigated Hazards.
Step 8: Repeat Step 6 for (still) unacceptable Hazards.
Step 9: Update Hazard Log with mitigated Hazards and their mitigations)
The above is an explanation of the SMS in general use which provides the evidence in the
Hazard Log that the Hazards have been identified, analysed, mitigated and deemed
acceptable.
Safety Management System
Safety Case
Safety
Safety Targets Acceptance
(Certification)
Hazard
Safety Monitor & Hazard
Log
Exposition Control Log
HMS/03/150216/Issue 1 Page 13