                                                  1       1  The mounting board is used as a formwork.  2  Three Reinforce steel
                                                    3  4  using bendable wire to strengthen the concrete and for the spacer we use
                                                  2       foam pieces.  3  Cement are made by mixing white and grey cement.  4
                                                    5     The concrete taken 7 days to cure for the test.  5  Two table are used to
                                                  6  7  8  help hold the beam.  6  Hook is being used to help test the load with two
                                                          begs full of objects.  7  (2cm X 2cm and 3cm x 2cm) are able to withstand
                                                          two beg full of objects.  8  The 2cm x 3cm started to crack and soon after
                                                          it broke.