1 1 The mounting board is used as a formwork. 2 Three Reinforce steel
3 4 using bendable wire to strengthen the concrete and for the spacer we use
2 foam pieces. 3 Cement are made by mixing white and grey cement. 4
5 The concrete taken 7 days to cure for the test. 5 Two table are used to
6 7 8 help hold the beam. 6 Hook is being used to help test the load with two
begs full of objects. 7 (2cm X 2cm and 3cm x 2cm) are able to withstand
two beg full of objects. 8 The 2cm x 3cm started to crack and soon after
it broke.