                                1  Drawing of the Top Slab/Rooftop for formwork.  2  Beam formwork is
                     1  2  3
                                inserted in the model.  3  Once the concrete beam is cure, We start to
                     4  5  6    cut-out the rooftop.  4  wire frame and space are added before pouring
                                the mixture.  5  Extra tape we being used in order to ensure there is no
                     7  8
                           9    leakage when mixture is being poured.  6  The mixture is being pour to the
                                roof formwork.  7  Stones were added to help reduce  the consumption of
                                the cement mixture.  8  The left over mixture is pour all over evenly.  9
                                The completion of the concrete model.