                                                      1  4  5    1  We draw the blueprint for formwork and did a cut-out.  2  Next we
                                                                 start build the wireframe work.   3  we started to place all the
                                                      2
                                                         6  7    wireframe on the formwork.  4  Cement powder and water were mix.
                                                      3          5  The mixture is then poured on the floor slab.  6  we start to spread
                                                                 the mixture evenly.  7  we leave the mixture to cure and harden.