Page 43 - JordonPortfolio1
P. 43
042
1 4 5 1 We draw the blueprint for formwork and did a cut-out. 2 Next we
start build the wireframe work. 3 we started to place all the
2
6 7 wireframe on the formwork. 4 Cement powder and water were mix.
3 5 The mixture is then poured on the floor slab. 6 we start to spread
the mixture evenly. 7 we leave the mixture to cure and harden.