(FP-LOE) contract.  The contract deliverable was a study

            report and proposal for the next phase — all paper.

            We  worked  closely  with  the  folk  at  the  McDonnell

            Douglas Technology Incorporated in San Diego to go a
            little beyond a pure study and build a “role model” of our
            design to measure RADAR Cross Section  (RCS) using

            company funds.  We also requested management to add
            some additional company funds to the contracted effort to
            let  us  get  ahead  of  the  game  for  the  next,  more

            competitive,  phase  of  the  program.  We  wrote  what  I
            considered a great proposal for the first phase, and had

            already done enough of the study to start recommending
            some specific system designs.

            I had to go on a business trip the day before the proposal

            was to be submitted to the customer, but I had reviewed
            and approved the transmittal of the proposal. At the same

            time,  we  acquired  a  new  Vice  President  of  Advanced
            Programs – my new boss, G. Our LOT Christmas party
            was that Sunday.  When  I showed  up  at  the  party my

            reports looked like death warmed over, instead of being
            ready to enjoy our 13 working day hiatus.