DURO-GRIP  BOARD-MAX INSULATION ADHESIVE
                                                 ®
            ORDERING BOARD-MAX:                                        applicator until it “snaps” into the locked
            1.  The following items are available when ordering.       position.
               a.  A/B Tank Kit. (Item #11035)                   3.  Adhesive Test Spray:
                 Each kit includes:                                 a.  When spraying for the first time or when
                                                                       starting a new kit, it is recommended to trigger
                   “A” & “B” Tanks
                                                                       the gun only 1/2 to 3/4 open, until the desired
                   Hose/Gun Kit                                       output and spray pattern is achieved. This
                   8 Nozzles                                          controllable metering ability is a major
                                                                       advantage of the gun, allowing the user
                   Wrench
                                                                       complete control of the flow rate and spray
                   Installation Instruction Sheet                     pattern that best fits the application.
                                                                    b.  Apply several test shots on plastic or
            DIRECTIONS FOR USE:                                        cardboard before beginning the job.
            1.  Application Surface and Temperatures:               c. Extremely Important – When spraying is
               a.  For best results, all surfaces to be bonded         stopped for more than 30 seconds, the nozzle
                 must be clean, dry and free from dirt, dust, oil,     should be removed and replaced with a new
                 loose paint, wax or grease, etc.                      nozzle. The chemical in the nozzle will begin to
               b.  The temperature of the adhesive should be           cure and will clog the nozzle when spraying
                 between 75 – 85˚ F (24 – 29˚ C) and the               has stopped for more than a minute. If the
                 surfaces being bonded should be between               trigger is pulled while a clogged nozzle is on
                 30˚ F and 100˚ F (-1 – 38° C). Temperatures           the gun, the chemical from the tanks (which is
                 outside this range may affect bonding range,          under pressure!) will be blocked by the
                 dispensability and performance of the                 clogged nozzle and will cause a “back-up” of
                 adhesive.                                             chemical into the hoses, which is called a
            2.  Equipment Set Up:                                      crossover. The gun will no longer dispense
                                                                       chemicals in the right proportions and the
               a.  There are two tanks per system: an “A” tank         adhesive will not function properly. This
                 and a “B” tank that are both beige. These two         situation can be easily avoided by simply
                 tanks must have matching fill dates to be used        changing the nozzle when spraying is stopped
                 together.                                             for more than 30 seconds.
               b.  Shake the tanks for 1 to 2 minutes. Turn the   4. Adhesive Applications:
                 tanks upside down at least twice to ensure
                 complete agitation of the adhesive.                a.  To dispense foam, point the applicator’s
                                                                       nozzle at the surface to be sprayed, holding it
               c.  The tanks can only be used in the upright           approximately 20 inches from the surface.
                 position (never open the valves unless the            Squeeze the trigger and move hand at a
                 tanks are upright).                                   speed which delivers the desired adhesive
               d.  The lids on the boxes are designed to shield        pattern. Apply adhesive in a serpentine
                 the tanks from direct sunlight and keep the           pattern. Nozzles are temperature-activated.
                 adhesive from getting too hot. For this reason,       If nozzles turn blue, then adhesive is too
                 the box lid should remain closed during use.          cold to apply. Adhesive must be warmed
               e.  Using the wrench included in the nozzle pack,       up prior to proceeding.
                 connect the RED striped hose to the “A” tank.      b.  Refer to the “Determining Bead Spacing”
               f.  Connect the BLACK striped hose to the “B”           section for the spacing between beads.
                 tank.                                              c.  Insulation boards are to be placed immediately
               g.  Slowly open the tank valves and inspect the         on the wet adhesive but not walked-into-place
                 connections for any leaks. Tighten if needed.         or compressed into the adhesive until the
                 Fully open the valves.                                adhesive has begun to thicken and has started
               h.  Activate the trigger, dispensing into a             to develop its initial bond.
                 proper waste receptacle, until all the air is      d.  The time involved in this process is contingent
                 released from the hoses and a good stream             on the ambient as well as deck surface
                 of both chemicals is visible through the              temperature. The chart below illustrates the
                 applicator orifices.                                  approximate time required prior to walking in
               i.  Clean residue from the output tips.                 or adding ballast to the boards.
               j.  Attach the mixing nozzle to the applicator.    Ambient/Deck Temperature   Time Before Walking In
                 Insert the bottom tab of the nozzle into the            40 – 60° F             6 – 10 minutes
                 bottom slot of the applicator gun. Secure the           60 – 80° F              3 – 6 minutes
                 top latch by pushing towards the back of the
                                                                        80 – 100° F              1 – 3 minutes


               www.duro-last.com                           3 of 4                                 800-248-0280
                                Duro-Last, Duro-Guard, Duro-Grip and “World’s Best Roof” are registered trademarks owned by Duro-Last, Inc.
                                               Created: 03/20/2017 Revised: 03/21/2017, 03/23/2017
   151   152   153   154   155   156   157   158   159   160   161