Page 159 - Microsoft Word - 2_Inch_Drain_Adapter_PDS_2016_01_05
P. 159

DURO-GRIP  CR-20 INSULATION ADHESIVE
                                                    ®
            DETERMINING BEAD SPACING:                            8.  Do not use on any roof deck that shows signs of
                                                                    deterioration or loss of integrity.
            1.  Apply CR-20 per the “Directions for Use” section.
                                                                 9.  Do not use on excessively dirty or grease laden
            2.  For any project located in an area with the design   surfaces.
               wind speed greater than 120 mph or a roof deck
               height greater than 100 feet, the Duro-Last       10. Do not use after expiration date.
               Engineering Services Department must determine
               the bead spacing pattern to be used. Otherwise,   STORAGE AND HANDLING:
               use the guidelines below.
                                                                 1.  The “A” and “B” tanks should be stored between
            3.  The spacing between beads of CR-20 is less in       45 and 95° F (7 – 35° C). The shelf life at these
               the perimeter area of the roof than in the main      temperatures is 18 months from the date of
               field area to compensate for higher wind uplift      production.
               pressures.
                                                                 2.  Follow instructions on the “A” and “B” boxes for
            4.  The width of the perimeter area is defined as the   overnight and longer term storage.
               lesser of either 40% of the building eave height or
               10% of the lesser roof plan dimension, but in no         TABLE 1. TYPICAL PHYSICAL PROPERTIES
                                                                                                               1
                                                                                               1
               case less than 6 feet. The remainder of the roof is   Product       A  –  Component    B – Component
               the field area.                                                       Polymeric
                                                                       Base         Isocyanurate    Polyol Amines
               a.  Perimeter area: apply beads 6 inches on
                 center.                                           Blowing Agent       134a             134a
                                                                   Physical Form       Liquid          Liquid
               b.  Field area: apply beads 12 inches on center.
            5.  Use the bead spacing above for all layers to be   Net Weight (tank)   40.0 lbs.       35.0 lbs.
               applied with CR-20.                                 Specific Gravity    1.23             1.1
                                                                    (77° F/25° C)
            6.  Refer to Table 2 for the estimated coverage per        Color         Light Brown    Amber to Brown
               each A/B Tank Kit based on bead spacing.
                                                                   Volatile Organic    0 g/L          135.6 g/L
                                                                  Compounds (VOC)
            LIMITATIONS:                                          VOC when used as
            1.  Maximum size of insulation board to be attached   intended with both          67.5 g/L
               with CR-20 is 4 x 4 foot (1.2 x 1.2 m).                 parts
                                                                  Flash Point (TCC)   >200° F (>93° C)   >200° F (>93° C)
            2.  Maximum size of cover board to be attached with     Auto Ignition
               CR-20 is 4 x 8 foot (1.2 x 2.4 m)                    Temperature   >600° F (>315° C)   Not Determined
            3.  The adhesive temperature must be between 70°    Viscosity (77° F/25° C)  130 cps       150 cps
               F and 90° F (21 – 32° C) when applied. This           Mix Ratio         1.14              1
               ensures that the proper mixing ratio is maintained   1  Technical information and data should be considered representative
               during installation and will give the best yield per   or typical only and should not be used for specification purposes.
               tank kit. When the adhesive temperature falls
               outside of this range the tanks may take several    TABLE 2. TYPICAL PROPERTIES – MIXED COMPONENTS
               hours to adjust to an acceptable temperature.
               Therefore, keeping the tanks in a warm                    Properties           Mixed Components
               environment overnight during cold weather           Open Time (2.5-inch bead)    1.5 – 5 minutes*
               months and keeping the tanks from getting to hot    Work Life in Mixing Nozzle     1 minute*
               in the summer will avoid delays during                 Time to Tack Free         5 – 12 minutes*
               installation.                                       Time to Handling Strength   4 – 8 minutes after bonding*
            4.  The substrate temperature that the adhesive is        Time to Full Cure           24 hours
               applied to must be at least 40° F (5° C) and rising.                  Coverage
            5.  Do not use during inclement weather.              2.5-inch beads, 12 inches o.c.   2,000 sq-ft per A/B Tank Kit
                                                                         (field area)
            6.  Concrete and gypsum decks must be cured           2.5-inch beads, 6 inches o.c.
               before applying CR-20.                                  (perimeter area)     1,000 sq-ft per A/B Tank Kit

            7.  Do not use on wet surfaces. Do not install      * Times may be affected by temperature and weather conditions.
               CR-20 on a wet surface. Take whatever
               precautions are necessary to ensure that the
               surface is dry during the application and curing of
               the CR-20.




               www.duro-last.com                           2 of 4                                 800-248-0280
                                Duro-Last, Duro-Grip, Duro-Guard and “World’s Best Roof” are registered trademarks owned by Duro-Last, Inc.
                                           Created: 01/01/2009 Revised: 05/20/2010, 12/30/2015, 03/20/2017