   64  12  19  15  LEED CS 2009 Scorecard  6/8/2018                        Project Manager: Keith Amann   Built Ecology
                 Certified: 40-49 points; Silver: 50-59 points; Gold: 60-79 points; Platinum: 80 - 110 points  email: keith.amann@wsp.com
   Y   H  L  N                                                        TENANT
                      CREDIT NAME   PTS      LEED CREDIT REQUIREMENTS  SCOPE ITEM  ACTION ITEMS / NOTES  STATUS  TEAM LEAD
                Project Information Forms
                                       Complies with local environmental laws, is a
   P            PIf1: Minimum Program Reqs.  permanent structure, has a reasonable site                         WSP
                                       boundary, minimum SF, commits to sharing water


                                       Provide SF data for the project and building, budget,   Confirm final site and building SF areas. LEED






   P            PIf2: Project Summary Details  site info, and energy and water supply info  Project Boundary includes sidewalks to street,   DBB
                                                                           extending beyond the property line.   RAL
                                       Enter space use and occupancy data  WSP calculating occupancy default based program   WSP
   P            PIf3: Occupant Usage Data                                  type.                                DBB
                                       Enter project schedule and upload general plans
   P            PIf4: Schedule Overview Docs.  provide a general narrative about the project and the            WSP
                                       MEP systems
   19  0  6  5 Sustainable Sites (SS)
                                       Implement an Erosion and Sedimentation Control                           Sam
   P            SSp1: Construction Activity   plan per EPA Construction General Permit (or local   Standard practice in NYC, civil to develop narrative   Schwartz
                Pollution Prevention (C)   code) describing measures implemented to prevent   plan, Suffolk to implement control measures.
                                       loss of soil, sedimentation, and pollution.                             Suffolk
                                       Avoid threatened habitat, parkland, farmland,
    1           SSc1: Site Selection (D)  1  wetlands (100'), AND previously undeveloped land 5'   Confirmed    WSP
                                       above 100 yr floodplain 50' from water bodies.
                                       Previously developed site in community with min.
    5           SSc2: Development Density &   5  density of 60,000 sq. ft. per acre net (two-story   Anticipate exemplary performance  WSP
                Community Connectivity (D)
                                       downtown development).
                                       OR
                                       Develop on site classified as a brownfield by a local/
             1  SSc3: Brownfield Redevelopment   1  state/ federal govt. agency. Effectively remediate site   Confirm no asbestos or other site contamination.
                (D)                    contamination.
                                       Within 1/4 mile of one or more stops for two or more
    6           SSc4.1: Alternative Transportation,   6  public or campus bus lines.  WSP completing documentation, anticipate   WSP
                Public Transportation Access (D)
                                                                           exemplary performance
                                       >300,000 sf: Secure bike storage for 3% of peak
                                       building users for up to 300,000 sf then an additional   Confirm bike racks and showers to be located in
                SSc4.2: Alternative Transportation,   0.5% for occupants in space over 300,000.  cellar or fitness center amenity and accessible to all   RAL
    2           Bicycle Storage & Changing Rooms   2                   Y   tenants:                             WSP
                (D)                                                        Bike racks required: ~30             DBB
                                                                           Showers required: ~5
                                       Preferred parking for low-emitting/fuel efficient
                                       (LE/FE) vehicles for 5% of parking capacity
                SSc4.3: Alternative Transportation,   OR
             3  Low Emitting  and Fuel Efficient   3  Provide 20% discount for LE/FE vehicles.   No parking planned, N/A
                Vehicles (D)           OR
                                       Install alt-fuel stations for 3% of total vehicle parking
                                       capacity
                                       Size parking capacity to meet, not exceed, min. local
                                       zoning reqs AND for projects that provide parking for
    2           SSc4.4: Alternative Transportation,   2  less than 5% of FTE occupants, provide preferred   No parking planned  WSP
                Parking Capacity (D)
                                       parking for carpools or vanpools with signage for 3%
                                       of total parking spaces OR provide 20% discount for
                                       carpool/vanpool vehicles.
                                       Previously developed: Restore/protect a min. of 50%
                                       of site area (excluding the building footprint) or 20%
                SSc5.1: Site Development, Protect   of total site area (including building) whichever is >   ~3,000 sf of native vegetation required, not likely
    0  0  2     or Restore Habitat (C)*  1  with native or adapted veg. **Projects earning SS   achievable. Alternative option would be to donate   RAL
                                                                                                                DBB
                *Regional Priority Bonus Point
                                                                           money to land trust.
                Avail.                 Credit 2 and using veg. roof surfaces can use veg.   (RP credit available for 1 additional point)
                                       roof surface in calculation if  plants meet
                                       native/adapted definition.
                                       Sites with zoning but no open space reqs:  provide
                                       veg. open space = 20% of project site area.
                                       **For urban projects earning SSc2, veg. roof areas   Roof and rear courtyard would need to be
    0     1     SSc5.2: Site Development,   1  AND pedestrian hardscape areas (with 25% of open   considered publicly accessible.   RAL
                Maximize Open Space (D)  space to be veg.) AND wetlands/ponds with 1:4 or   (~3,000 sf of open space required, with min. 750 sf   DBB
                                       less gradient count as open space.   to be vegetated).
                SSc6.1: Stormwater Design -   Sites with imperviousness ≥ 50%:
          2     Quantity Control (D)*  1  Implement stormwater mgmt plan resulting in 25%   Consider capturing roof runoff for on-site reuse  WSP
                                       decrease in the quantity of stormwater runoff from 2-
                *Regional Priority Bonus Point
                Avail.                 year, 24-hour design storm.
                                       Use Best Management Practices (BMPs) to treat
          1     SSc6.2: Stormwater Design -   1  80% Total Suspended Solids (TSS) for 90% average   Discuss opportunities for treatment at detention tank   WSP
                Quality Control (D)
                                                                           with filtration system
                                       annual rainfall.
                                       For 50% of the site hardscape provide:
                                       - Tree shade (within 5 yrs of occupancy)
    1           SSc7.1: Heat Island Effect - Non-  1  - Shade from structures covered with solar panels or   Confirm finishes at ground level and ensure light   DBB
                roof (C)               with SRI ≥ 29.                      colored (typical concrete or other) surfaces selected.
                                       - Paving materials with SRI ≥ 29
                                       - Open grid pavement (50% pervious)
  WSP Built Ecology                                                                                              1 of 4