   64  12  19  15  LEED CS 2009 Scorecard  6/8/2018                        Project Manager: Keith Amann   Built Ecology
                 Certified: 40-49 points; Silver: 50-59 points; Gold: 60-79 points; Platinum: 80 - 110 points  email: keith.amann@wsp.com
   Y   H  L  N                                                        TENANT
                      CREDIT NAME   PTS      LEED CREDIT REQUIREMENTS  SCOPE ITEM  ACTION ITEMS / NOTES  STATUS  TEAM LEAD
                                       Install high reflective roofing on 75% of roof surface.   Confirm roofing surfaces, landscape areas and PV
    1           SSc7.2: Heat Island Effect - Roof   1  For low-sloped roof ( ≤ 2:12), SRI ≥ 78. For steep-  canopy sf values, and apply weighted area calc to   DBB
                                       sloped (> 2:12), SRI ≥ 29.
                (D)
                                                                           confirm compliance.
                                       Interior lighting: reduce input power of non-
                                       emergency luminaries with direct line of sight to
                                       exterior by 50% b/w 11pm and 5am, with manual
                                       override of no more than 30 min.
                                       AND                                 Difficult to achieve for zero lot line projects and
             1  SSc8: Light Pollution Reduction (D)  1  Exterior lighting: Light areas only as required for   based on current plans. Alternative option to use   WSP
                                       safety and comfort, with lighting power densities not
                                       to exceed ASHRAE 90.1-2007 for the classified zone   BUG rating method per LEEDv4 could be pursued.
                                       selected for project. Meet exterior lighting control
                                       requirements from ANSI/ASHRAE/IESNA Standard
                                       90.1-2007 (with errata but without addenda) Exterior
                                       Lighting Section, without
                                       Publish document illustrating sustainable design and
    1           SSc9: Tenant Design and   1  construction features of CS project, info on LEED CI,   WSP to provide draft tenant guidelines for review   WSP
                Construction Guidelines (D)  building contribution to CI, and recommendations for   and adoption.   RAL
                                       future sustainable strategies and services.
    8  0  0  2 Water Efficiency (WE)
                                       Reduce indoor water use by 20% over baseline,
                WEp1: Water Use Reduction  including WC, urinals, lavs, showers, kitchen sink   Y  See WEc3.
                                       and pre-rinse valves.
                                       Option 1 (2 pts): Reduce potable water consumption
                                       for irrigation by 50% over local baseline.   Species selection (native, drought tolerant species)
                                       OR                                  along with rain sensors and drip irrigation will earn 2
                                       Option 2 (4 pts):  Reduce total water use by 50%   points. Remaining 2 points requires use of NO   RAL
    4           WEc1: Water Efficient Landscaping   4  AND use only non-potable water for irrigation; or    Y  potable water.   WSP
                                                                           Vegetated areas on roof terrace and rear courtyard
                                       Reduce total water use by 50% AND install
                                       landscaping not requiring permanent irrigation.  must be minimum of 775 sf and be drought tolerant   DBB
                                                                           species irrigated with captured rainwater for 4 points.
                WEc2: Innovative Wastewater   Reduce potable water for sewage conveyance by
             2  Technologies*        2  50% compared to EPAct 1992.
                *Regional Priority Bonus Point
                Avail
                                       Reduce indoor water use by 30% (2 pts), 35% (3
                                       pts), or 40% (4 pts) over EPAct 1992
                                                                           Target flush/flow rates:
                                                                           -WC: 1.28 GPF max
                                                                           -Urinals: waterless, hybrid waterless, or 0.125 GPF
    4           WEc3: Water Use Reduction   4                          Y   (pint) flush                         DBB
                                                                           -Lav Faucets: 0.35 GPM w meter/sensor  WSP
                                                                           -Showers: <1.5 GPM
                                                                           -Pantry Faucet: <1.0 GPM
   19  11  7  2 Energy and Atmosphere (EA)
                                       Independent Cx agent to review owner's BOD,
   P            EAp1: Fundamental Commissioning   incorporate Cx requirements into CDs, develop Cx   Y  WSP contracted for Cx  WSP
                                       plan, verify installation and performance of Cx
                of the Building Energy Systems (C)
                                       systems, complete Cx report summary.
                                       Whole Building Energy Simulation: based on
   P            EAp2: Minimum Energy   Appendix G ASHRAE 90.1-2007: show 2%   Y  See EAc1                       WSP
                                       improvement in performance for new buildings AND
                Performance (D)
                                       comply with mandatory provisions.
   P            EAp3: Fundamental Refrigerant   No CFC based refrigerants. Phase out plan for   Y               WSP
                                       existing buildings.
                Management (D)
                                       See EAp2 requirements above.
                                       2%- Prerequisite and 3 points
                                       3%- 4 points
                EAc1: Optimize Energy   5%- 5 points
   10  6  4  2  Performance*        21  7%- 6 points                   Y   Modeling assumptions and ECM's to be further   WSP
                *Regional Priority Bonus Point
                                                                           discussed following SD report issuance
                Avail. (40%)           9%- 7 points
                                       11%- 8 points
                                       1 point thereafter for every 2% increase
                EAc2: On-Site Renewable Energy:    On-site solar, wind, hydro or biomass for 1% of total        RAL
       5        (D)*                 4  annual energy cost. 1% for 4 points.                                    DBB
                *Regional Priority Bonus Point
                Avail                                                                                           WSP
                                       Third party Cx agent to review owner's BOD prior to
                                                                                                                WSP
    2           EAc3: Enhanced Commissioning   2  CD, review contractor submittals, develop systems   Y  WSP will engage Skyline for Enhanced Cx as   Skyline
                                       manual, verify that training requirements are
                (C)
                                                                           independent third party agent.
                                       completed, develop Cx plan.
                                       HVAC&R to minimize ozone depletion based on   Confirm with preliminary calculations. Will need to
    2           EAc4: Enhanced Refrigeration   2  specified formula. AND for both options: no CFC or   Y  include lease language related to supplemental   WSP
                Management  (D)
                                       HCFCs in fire suppression systems
                                                                           refrigerants for tenant spaces.