Page 15 - MKP Brochure Template. mk1
P. 15
dEWAr
PlAcE
––
cEnTrAl ElEcTriciTy
gEnErATing sTATiOn
––
The project consisted of a
two stage cooling system for
dissipation of heat generated from
electrical gas transformers and
shunt reactors, which provided
the required cooling capabilities
whilst retaining the operational
flexibility normally associated with
redundancy in the main plant
equipment.
The project was designed to power
generation standards.
The mechanical services were
designed with finite precision to
meet the clients detailed checking
procedures and understandable
attention for detail for such
a technologically advanced
installation.
All drawings were produced in
3d to assist the contractors and
minimize working drawing and
eliminate on-site clashes.
––