Page 200 - METRO CENTER PDF BINDER 1
P. 200

RECESSED T-BAR MOUNTING INSTALLATION GUIDE (T/X/N)


                                1                         D                                             2


                                                                                                                                                                                   C




                                                              B




                                                                                                                                                                                      C
                                                                       C
                                                                                                                                        A
                                                                                                                           1
                                            A


                                                                                                                                                                              B




                                                                                                        3                                                 A                 4
                                                                                                           D/G JOINER







                                     C
                                                                                                                                                                                                        A
                                            N = 9/16” SLOT   T = 9/16” + 1/2”  X = 15/16” + 1”
                                                                                                          ACL1/4 JOINER



                                                                                                                                                                                                         B
                                                                                                                                         B

                                                                                                                                                            C
                                                                                                                                           ACL2/3/5 JOINER
                              INSTALLATION STEPS

                              Attention: Risk of fire and electrical shock - fixture to be installed by qualified electrician according to local codes and ordinances.
                              Attention: Ensure proper handling of LEDs to limit common problems including: broken connection, loose wiring, and damage from electrostatic discharge.
                                1     [A] - Install T-bar, keeping in mind the spacing dimensions provided in the chart below. Consult   2  ROWS
                                                                                                                                         [A] - When rows are ordered, row sections will be labeled in sequence. Position section in proper
                                              submittal drawings if modified lengths were ordered.
                                      [B]  - Powerfeed connections through KO hole: White+, Black-, Green (if dimming is required): Purple Dim+,           order prior to installation (ie place 1 to 1).
                                              Grey Dim-                                                                                  [B] - Remove the lens. Apply suction cup (provided) to one end and carefully pull lens out.
                                      [C] - Flanges should sit on top of t-bar surface, as per the profile diagrams.                     [C] - Remove reflectors (if applicable) and internal gear tray by unfastening hardware.
                                      [D] - Attach tie-off cables to tie-off holes on fixture end caps and attach each end to structure above as
                                              per local code.                                                                      3     [A] - Housing connection: White+, Black-, Green (if dimming is required): Purple Dim+, Grey Dim-
                                          ON-CENTER DIMENSIONS:                                                                          [B] - Align corner pins and connect fixture housings with rubber mallet until no gap remains.
                                                                                                                                         [C] - Secure sections with joiner screws.
                                                     T-BAR    T       N        X       T4      N4       T6      N6
                                          ON-CENTER   ACL   2-7/8”   2-7/8”  3-7/32”                                               4     [A] - Reinstall reflectors (if applicable) and internal gear tray. Install lamps (by others, if applicable).
                                                                                                                                         [B]  - Reinstall lens.
                                              WIDTHS  D5/D7  4-5/32”  4-5/32”  4-1/2”  4”      4”
                                                       D6     6”      6”       6”
                                                        G   5-11/16”  5-11/16”  6”                      6”      6”
                                          ON-CENTER LENGTH            24”, 36”, 48”, 60”, 72”, 84”, 96”, 108”, 120”, 144”
                              APPLICABLE LUMINAIRES: ACL5, ACL7, D5, D6, D7, G5
   195   196   197   198   199   200   201   202   203   204   205