Page 201 - METRO CENTER PDF BINDER 1
P. 201

RECESSED T-BAR MOUNTING INSTALLATION GUIDE (T/X/N)


 1  D  2


                                                        C




 B




                                                            C
 C
             A
 1
 A


                                                    B




 3                              A                 4
 D/G JOINER







 C
                                                                              A
 N = 9/16” SLOT  T = 9/16” + 1/2”  X = 15/16” + 1”
 ACL1/4 JOINER



                                                                              B
              B

                                  C
                 ACL2/3/5 JOINER
 INSTALLATION STEPS

 Attention: Risk of fire and electrical shock - fixture to be installed by qualified electrician according to local codes and ordinances.
 Attention: Ensure proper handling of LEDs to limit common problems including: broken connection, loose wiring, and damage from electrostatic discharge.
 1  [A] - Install T-bar, keeping in mind the spacing dimensions provided in the chart below. Consult   2  ROWS
               [A] - When rows are ordered, row sections will be labeled in sequence. Position section in proper
         submittal drawings if modified lengths were ordered.
 [B]  - Powerfeed connections through KO hole: White+, Black-, Green (if dimming is required): Purple Dim+,           order prior to installation (ie place 1 to 1).
         Grey Dim-  [B] - Remove the lens. Apply suction cup (provided) to one end and carefully pull lens out.
 [C] - Flanges should sit on top of t-bar surface, as per the profile diagrams.  [C] - Remove reflectors (if applicable) and internal gear tray by unfastening hardware.
 [D] - Attach tie-off cables to tie-off holes on fixture end caps and attach each end to structure above as
         per local code.  3  [A] - Housing connection: White+, Black-, Green (if dimming is required): Purple Dim+, Grey Dim-
 ON-CENTER DIMENSIONS:  [B] - Align corner pins and connect fixture housings with rubber mallet until no gap remains.
               [C] - Secure sections with joiner screws.
 T-BAR  T  N  X   T4   N4   T6   N6
 ON-CENTER  ACL  2-7/8”  2-7/8”  3-7/32”  4  [A] - Reinstall reflectors (if applicable) and internal gear tray. Install lamps (by others, if applicable).
               [B]  - Reinstall lens.
 WIDTHS  D5/D7  4-5/32”  4-5/32”  4-1/2”  4”  4”
 D6  6”  6”  6”
 G  5-11/16”  5-11/16”  6”  6”  6”
 ON-CENTER LENGTH  24”, 36”, 48”, 60”, 72”, 84”, 96”, 108”, 120”, 144”
 APPLICABLE LUMINAIRES: ACL5, ACL7, D5, D6, D7, G5
   196   197   198   199   200   201   202   203   204   205   206