Page 12 - E:\CloudStation\Project\1 DONE\Ranhill CIMAH\Flip Book\
P. 12

Control of Industrial Major Accident Hazards (CIMAH) Report   Page       2
                                            Ranhill SAJ Holdings Sdn. Bhd.                Revision      01
                                                 Summary of Findings                      Date        Aug 2019

              SECTION               No.  ITEM                    FINDINGS
                                     ii.   Analytical Method     Chlorine detection using Chlorine Gas
                                          or Scientific          Detector & Alarm System installed on-site.
                                          Literature
                                                                 Refer Part A.2.1

                                     iii.  Hazards which         Toxic gas dispersion due to loss of
                                          may be created by  containment.
                                          hazardous
                                          substance              Refer Part A.3.1

                                     iv.  Degree of purity of  RSAJ quality control and standard.

                                          hazardous
                                          substance              Refer Part A.4.0


                                      i.   Map of the site and  Map of the site is given in the report. The
                                          its surrounding        Plant is surrounded by palm oil plantation

              B: Information              area                   and rubber estate located approximately
                relating to the                                  two (2) km north of Segamat town.
                Installation

                                                                 Refer Part B.1.0

                                     ii.   Scale plan of the     Scale plan of the site is given in the report.
                                          site
                                                                 Refer Part B.2.0
                                     iii   Description of the    Chlorine cylinders / drums are stored at
                                          processes or           the Chlorine Room. The typical processes
                                          storage involving      in the plant include the loading of drum
                                          hazardous              and injection of chlorine gas into the

                                          substance              system.

                                                                 Refer Part B.3.0
   7   8   9   10   11   12   13   14   15   16   17