Page 67 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 67

4.2.7 Oven and Fan Wiring                         4.2.8 Testing and Completion

The main site electrician will be required to     Upon completion the electrical installation shall
supply simple on/off switches and wire to         be fully tested, proved and working.
isolator adjacent to each fan.
                                                  •	 Full test results and the appropriate
The electrical supply to each oven socket must        certification shall be provided for all electrical
be independent, so that in the event that one         systems including emergency lights and fire
circuit breaker trips, power is not lost to both      alarms.
ovens at the same time. Note also that although
the PS 200/540 and XLT3255 ovens will run from a  •	 An emergency telephone number for the
standard twin 13a S/S/O, the PS360EWB and PS          electrician, MUST be written on the fire alarm
555 will require 2No. 20A rated sockets & plugs       panel for use in the event of electrical/
(Reyrolle type)                                       operating faults.

                                                  •	 The reset code MUST be written on the fire
                                                      alarm panel.

                                                  •	 Provide a comprehensive operation and
                                                      maintenance manual including details of
                                                      the systems installed and record drawings
                                                      indicating the layout and interconnections
                                                      of all items.

                                                  •	 Allow to demonstrate the operation of all
                                                      electrical systems to the end user at hand
                                                      over.

                                                  •	 Final invoices will not be paid until test
                                                      certificates are received.

4.2.7 - 4.2.8  Oven and Fan Wiring and Testing and Completion  3 February 2016