Page 64 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 64
4.2.2 Electrical Services • All wiring and cable containment shall be
concealed within the building fabric and
• All electrical contractors employed on within the false ceiling void.
ANY Domino’s site, whether self-build or DP
UK&I Ltd build, MUST be either ECA or NEIC • All wiring must be run in suitable conduits or
Registered. cable trays.
• The project includes all of the Electrical • Final locations of all outlets and equipment
Services work associated with the fitting out shall be in accordance with the DGP
of an existing unit to create a fully operational Standard layouts and fully coordinated
Domino’s pizza delivery store. with other trades. Any deviations from the
standard details must be agreed with the
• The Electrical Contractor shall be responsible Project Manager/Client prior to installation.
for detailed design, supply, installation, co-
ordination with other disciplines, testing and • All wiring, including computer, telecoms
commissioning for all items as detailed in this and electrical, within the counter, shall be
specification and accompanying drawings. run in suitable trunking terminated through
standard boxes. It is the responsibility of
• All works shall be carried out in accordance the Main Contractor to ensure that this
with the latest relevant British and European is complied with by his electrical sub-
Standards including BS7671 (17th Ed IEE contractor.
Wiring Regulations or subsequent updates/
revisions), current at the time of installation. • Data and telecoms cables must each
emerge from walls/trunking in suitable back
The works shall include: boxes and be positioned so that standard
• Removal and disposal of any existing modular face plates may be fitted.
redundant installations. • Earth bonding of fixed metal equipment
• Mains distribution equipment. shall be carried out by the site electrician
• General lighting. as required by the Regulations.
• Emergency lighting.
• External lighting. • Installation of RCBO’s is expected where
• Small power. “Best Practice” would call for their use,
• Fixed power to equipment and signage. even in discretionary or ‘grey areas’ of the
• Computer cabling. regulations.
• Fire Alarm.
• Telephone wiring. • Final circuit testing MUST be in full compliance
• Door bell. with the appropriate regulations.
• Testing and commissioning.
• Provision of record documentation.
• User/Client demonstration and training.
4.2.2 Electrical Services 3 February 2016