4.1 Utilities Installation - Enabling Works




          4.1.1 Electrical Services - Best Practice Guidance
          Where  the  electric  meter  is to  be  located
          internally,  the  following  preparatory  works  will
          be required:
          •  Install  50mm  entry  ducting  with  sufficient
             radius to  allow  cable installation to  below
             internal  meter  position  to  exit  building  at
             minimum 450mm below the outside surface
             level
          •  Install  fireproof  back  board  (sizes  are
             approximately  2000mm  high  x  1000mm
             wide) and to be sited between 500mm and
             2000mm above finished floor level
          •  All  internal  cabling  and  meter  tails  to  be
             installed by a qualified electrician ready for
             connection to the meter
          •  Black ducting must be used for all electrical
             services.


          On site excavation
          For  stores  with  a private forecourt  or  private
          land within its boundary, on site excavation and
          reinstatement will be your responsibility (unless
          otherwise specified).

          Best practice on site excavation
          •  Install  minimum  125mm  plastic  rigi  duct
             from  the  store  to  the  boundary  edge  (this
             changes in colour dependent upon area so
             please refer to the quote and utility drawing)
          •  Duct must be fitted with a draw cord
          •  To  be  laid  approximately  600mm  deep
             (specification will be in quote)
          •  Overlay  duct  with  caution  warning  marker
             tape












          4.1.1                      Electrical Services - Best Practice Guidance           3 September 2018