Page 40 - B8773-AEW-XX-XX-PP-A-0001_[P4]_Contractors Manual
P. 40

D R A F T


       2.5.5 Ceiling Junction with Sneeze screen
       A  RAL  7037  powder  coated  channel  should
       be installed in the ceiling, flush with the face of
       the ceiling tiles, to accept the sneeze glass. This
       must line up with the white channel in the wall
       and the S/S channel in the top of the slap table
       front.  The  channel should be independently
       supported from above.



























































       2.5.5                       Ceiling Junction with Sneeze Screen                   3 February 2016
   35   36   37   38   39   40   41   42   43   44   45