INNOVATIVE TECHNOLOGY

                                                                     Facilities". As  a  result  of  hazard  and  risk
               SIL-oriented hike. How to apply GOST R  analysis in accordance with the requirements
        IEC 61511                                                    of clause 8.2.1 of GOST R IEC 61511-1-2011
               By  definition,  the  Safety  Instrumented  [3], the following should be:
        Function  (SIF)  includes  all elements  from  the  1) descriptions of each specific dangerous event
        sensor to the actuator (Fig. 3). The probability  and factors influencing it are received;
        of  a  circuit failure  when  requesting  a  lock  is  2) a  description  of  the  consequences  and
        equal to the sum failure probabilities of elements  credibility of the event;
        included in the circuit.                                     3) conditions are  considered,  such  as
               Simplified: PFDloop = PFDsensor + PFDplc  conditions of  normal operation,  start-up,
        + PFDvalve.                                                  shutdown,  maintenance,  start-up  of  the
        Therefore,  if  the  SIL3  controller  is present  in  process, emergency shutdown;
        the  considered  circuit, but  the  outdated  and  4)              requirements        are    established      for
        inadequate "field" equipment does not meet the  additional risk  reduction necessary  to
        safety  integrity  requirements,  then  the  safety  achieve the required safety;
        integrity level of the entire circuit will be SIL0.          5)  a description has  been  made  (or
               The task  of  moving from  "controller  appropriate links given) of measures taken
        requirements"  to "circuit requirements"  is to  to reduce or eliminate dangers and risks;
        perform the following activities:                            6) the  assumptions  made  during  the  risk
        ● compliance  with  the  EAP  system  project  analysis  are  described  in detail,  including
        implementation  stages  according  to GOST R  the probable intensity of the requests and
        IEC 61511: from hazard and operability analysis  the  failure  rate  of  the  equipment,  as  well
        (HAZOP)  to  the  distribution and  assignment  of  as any information about the limitations of
        SIL  levels to safety  functions,  development  of  working conditions and human intervention;
        EAP system requirements (SRS specifications);                7) the  distribution of  security  functions
        ● organizational  measures  at  the  enterprise  among  protection  layers  is  accepted,
        (functional  safety  management,  personnel  taking  into account  a  possible decrease  in
        training,  organization  of  verification  processes,  protection  efficiency  caused  by  a  failure
        procedures and accounting);                                  due  to  a  common  reason,  it is possible
        ● technical measures at the enterprise (functional  both  between  different  protection  layers
        safety assessment tools);                                    and between these layers and the common
        ● willingness of suppliers to perform work.                  process control system (DCS);
               As a result, it is advisable for the customer  8)  those  safety  functions  are  defined  that
        of the EAP system to divide the work into two  are  implemented  as  safety  functions  of  a
        stages:                                                      safety instrumented system (EAP).
        1) performing a hazard and risk analysis;                    ● Establishment of SIL safety integrity levels
        2) delivery and performance of work on the EAP  (assigned  by  SIL)  for  the  safety  function
        system.                                                      implemented on the EAP system.
                                                                     ● Development of a conceptual specification
                                                                     of safety requirements (Safety Requirment
                                                                     Specification),  according  to  GOST  R  IEC
                                                                     61511-1, based on the results of the stage
                                                                     hazard and risk analysis. As a rule, the first
                                                                     stage  should  be  performed  by  an  expert
                                                                     organization  independent  of  the  supplier,
                                                                     since  the  results  of  the  stage  (list of  SIF
                                                                     protection circuits and assigned SIL) directly
                                                                     affect the solution specification and its cost.

                    Technical assignment                             Hazard and risk analysis can be carried out
                                                                     by a design institute for a new construction
                                                                     site or  by  an  organization-independent
                                                                     organization  with the  necessary  expertise
               The following tasks should be included in             when  modernizing an  automated  process
        the terms of reference for the first stage.                  control system. The conceptual specification
        ●  Identification,  analysis  and  forecasting  of           of safety requirements (SRS) should contain
        the  risk  of  accidents  [2]  in  accordance  with          general requirements for the safety system,
        paragraph 4 of Article 11 of Federal Law No. 116             a list of protection loops and requirements
        "On  Industrial  Safety  of  Hazardous  Production           for  each  of  them,  architectural  solutions