INNOVATIVE TECHNOLOGY

    from sensor to the executive device, requirements of orders of Rostekhnadzor, etc.
            When choosing a single supplier of EAP system tools, conceptual SRS should be a technical
    requirement for the system as a whole. If it is not possible to choose a single supplier, then the
    questionnaires for instrumentation and actuators, the technical requirements for the controller
    are filled in taking into account SRS data.
            The technical requirements for stage 2 should include the following requirements:
    ● Selection of circuit components, which is justified by the calculation of compliance with the
    assigned  SIL  level.  Circuit components  with  an  assigned  level  of  SIL1  and  higher  must  be




































                                                              certified and meet the requirements of GOST R
                                                              IEC 61508/61511.
                                                              ● Verification of safety circuits taking into account
                                                              certain  requirements  for  the  designated  SIL,
                                                              selected  equipment  and  construction  schemes
                                                              is carried out at the stage of creating working
                Technical assignment                          documentation.
                                                              ● Development of a detailed specification of SRS
                                                              safety  requirements,  taking  into  account  the
                                                              selected  equipment  and  the  design decisions
    made. The PAZ system provider, starting work on the second stage, based on the conceptual
    specification of the SRS safety requirements, selects the elements of the protection circuits
    from the sensor to the actuator and performs a verification calculation for compliance with the
    assigned (target) SIL level.
            When determining the conformity of the safety circuit to the assigned (target) SIL level,
    the GOST R IEC 61508/61511 standard requires compliance with the requirements of three
    standards:
    1) safety integrity regarding systematic failures;
    2) random failures;
    3) architectural restrictions.
            Mismatch to one of them entails a change in the intervals and testing methods, architecture,
    or hardware implementation.
            An example is the situation with shut-off valves. The SFF Safe Failure Rate will be less
    than 60 %. According to the table. 2 GOST R IEC 61508-2, with an SFF of less than 60 %, two
    cutoffs (HFT = 1) will need to be installed in the SIL2 circuit to ensure that three cutoffs will be
    required in the SIL3 circuit (HFT = 2). When using testing, the partial stroke SFF will be more
    than 90 %, and SIL3 will be enough for two shut-off valves (HFT = 1).