Page 333 - Installation Training Binder FIT1-3
P. 333

Step 7

                   Installing Neutralizing Pillows

                          Install pillows on the floor, inside the containment walls. Spread pillows out
                          to cover the maximum amount of space. Place serial numbers facing up
                          and  in  the  same  direction.  Please  note  that  the  rack  stanchions  may
                          interfere with uniform pillow layout. (Figure 7)

                                                        CAUTION!
                          Allow epoxy to cure completely before placing  pillows  beneath the
                          rack. Adding the pillows prematurely will damage them!













                                                             Figure 7



                                                        Congratulations!
                           This concludes the installation procedures for the CONDOR System




























                   EnviroGuard  800-206-9884          Fax  909-624-1772               www.enviroguard.com
                   11/2007 rev. B              Condor System Setup Instructions                 Page - 13 -
   328   329   330   331   332   333   334   335   336   337   338