Page 333 - Installation Training Binder FIT1-3
P. 333
Step 7
Installing Neutralizing Pillows
Install pillows on the floor, inside the containment walls. Spread pillows out
to cover the maximum amount of space. Place serial numbers facing up
and in the same direction. Please note that the rack stanchions may
interfere with uniform pillow layout. (Figure 7)
CAUTION!
Allow epoxy to cure completely before placing pillows beneath the
rack. Adding the pillows prematurely will damage them!
Figure 7
Congratulations!
This concludes the installation procedures for the CONDOR System
EnviroGuard 800-206-9884 Fax 909-624-1772 www.enviroguard.com
11/2007 rev. B Condor System Setup Instructions Page - 13 -