Page 24 - Bernardon Dover Master Plan Booklet
P. 24
RAISED INTERSECTION
STREETSCAPE SOLUTIONS
WIDENED SIDEWALK
SHORT TERM & LONG TERM INTERSECTION SOLUTIONS REPLACED STREET TREE
BOLLARD
SHORT TERM SOLUTIONS- The graphics below portray some short-term solutions to improve key intersection on Loockerman Street. Crosswalks and intersections can be painted
PLANTING WITH BENCH
by commissioned artists, or as a community event for residents of Dover and/or Delaware State University students and staff.
KEY: SHORT TERM SOLUTIONS
PARKLET
PAINTED CROSSWALK STREET
PAINTED INTERSECTION
BRADFORD
GOVERNORS
AVENUE
STREET
BRADFORD
GOVERNORS
AVENUE
PLANTING AREA
PLANTER LOOCKERMAN STREET LOOCKERMAN LOOCKERMAN STREET
LOOCKERMAN
LOOCKERMAN STREET
LOOCKERMAN LOOCKERMAN STREET LOOCKERMAN STREET POTTED PLANT STREET
STREET
STREET
OUTDOOR TABLES
BENCH
LONG TERM SOLUTIONS- Below are long term solutions that would require more time and coordination to be implemented but would have a significant impact. Constructing
raised intersections at these major crossroads allows for a safer walking experience that fosters a pedestrian first environment. Bollards can also be installed at street corners to
improve pedestrian lighting along with providing additional safety measures to separate the vehicular and pedestrian realm.
KEY: LONG TERM SOLUTIONS
RAISED INTERSECTION
RAISED INTERSECTION STREET
WIDENED SIDEWALK
BRADFORD
GOVERNORS
AVENUE
WIDENED SIDEWALK
STREET
BRADFORD
REPLACED STREET TREE
GOVERNORS
AVENUE
BOLLARD LOOCKERMAN STREET LOOCKERMAN LOOCKERMAN STREET
REPLACED STREET TREE
LOOCKERMAN STREET
LOOCKERMAN LOOCKERMAN STREET LOOCKERMAN LOOCKERMAN PLANTING WITH BENCH STREET
STREET
STREET
BOLLARD
STREET
PLANTING WITH BENCH
PARKLET
PAINTED CROSSWALK
PARKLET
PAINTED INTERSECTION
PAINTED CROSSWALK
23 CAPITAL CITY 2030: TRANSFORMING DOWNTOWN DOVER | Master Plan for Downtown Dover | Dover, DE | Downtown Dover Partnership
PLANTING AREA
PAINTED INTERSECTION
PLANTER
PLANTING AREA
POTTED PLANT
PLANTER
OUTDOOR TABLES
POTTED PLANT
BENCH
OUTDOOR TABLES
BENCH