Page 76 - CAPE Green Engineering Syllabus 2016.docx_Neat
P. 76
42. Which of the following is NOT a 44. A manufacturing entity implemented
challenge for renewable energy an environmental management system
adoption? and was certified in compliance to ISO
14000 standards. Which of the
I. Lack of environmental following are potential benefits of this
sensitivity and interest system?
II. High initial capital cost (A) Improvement in the overall
III. Absence of legislation, environmental performance
and compliance
regulatory institutions and
instruments (B) Increased efficiency and
potential cost savings when
(A) I only managing environmental
(B) II and III only obligations
(C) I, II and III
(D) III only (C) Promotion of predictability
and consistency in the
43. Which of the following is an example company’s environmental
of green engineering in the obligation
manufacturing and benefits of cement
replacement? (D) Improved customer
satisfaction and staff
(A) Greater durability and motivation
longevity
45. The improper disposal of large
(B) Reduced risk of thermal amounts of organic material in the
cracking distillation industry results in
significant negative consequences to
(C) Reduced carbon footprint
(D) Decreased permeability I. the environment
II. society
III. a country’s economy
(A) I, II and III
(B) I and II only
(C) I only
(D) II only
02165010/SPEC 2015