Page 56 - BACWA - ED - AMB 12 02 19
P. 56
Laurie Luke Vasquez, P. E. (916)988-1893-Home
9316 Castlemont Circle (916)367-8265 - Cell
Orangevale, California 95662 ljluke@comcast.net
included thorough research prior to design, site, soil-geotechnical anaysis,
development, contamination history, permits, maintenance problem issues
and future planned designs. I designed Water Resource Development,
Wastewater and Water Treatment Systems for Roadside Rest Areas, Truck
Inspection Facilities, Maintenance Stations, Irrigation wells for Highways
and Washracks to meet current and future regulations and rules. I
developed preliminary designs and obtained approved Waste Discharge
Permits and Drinking Water Permits. I accomplished this through
coordination and communication of meetings, inspections and
recommendations of changes for approved constructed systems with
regulatory agencies. I performed maintenance inspections and
investigations of Caltrans Facilities to develop improvement projects and
upgrade facility building projects development designs for Wastewater
and Water Systems and dual plumbing and water reuse. I designed and
developed projects and obtained funding and approval of projects that
resolved problem issues by redesign using innovative technology
including developing and writing all new specifications for design
products and performance specifications for system functions. Completed
Structures Representative rotation in Construction for Road widening,
Retaining Walls, Demo/Rebuild of several story maintenance facility and
performing office engineering tasks.
• Design and develop plans, specifications and control system for the
Shandon Roadside Rest Area, Water and Innovative Waste Water
Treatment System (using subsurface wetlands and Gravel Filter) to
treat Wastewater. Water quality after Gravel filter has measured
levels of Nitrates non-detect and <1. Received California
Transportation Association, Tranny of the Year Award. The design
will be used as a standard for rest areas throughout the country.
• Design and develop new plans and new specifications for water
resource and treatment systems including Reverse Osmosis Water
Treatment Systems for several Rest Areas, using anti scaling
pretreatment, and blending. I inspected, designed and investigated
many wells, geotechnical-soil conditions, hydrology and
hydraulics in the developed and rehabilitation plans to resolve and
improve wells and their performance.
• Completed in cooperation with the District 8, San Bernadino,
Environmental Department and Management, The CEQA/NEPA
documentation, computations, geological research and evidentiary
documentation, geotechnical report findings and water/wastewater
treatment system plans, specifications to comply with Endangered
Species Act, State and Federal Water Quality Regulations and
obtained approval from Bureau of Land Management to lease
federally owned land for a new California Vehicle Enforcement
Facility and Agricultural Inspection Facility at Mountain Pass on
I15.