61 IITGN-UL/Façade                                                                                                                                                           62 IITGN-UL/Façade












              18:39:30                              Ground floor                                           First floor                     Second floor

               -8.87 min                       Data acquisition system is started

               -7.65 min            Ignition of fire through remotely controlled electrical switch

                                                                                                                                                                                                                   Temperatures reach around 770°C. POP sheets attached
                0 min               Waste papers and accelerators used to ignite fire manually                                                                                             26.88 min                   with deck slab near façade level begin to fail            Temp at this level increased to 220°C


               0.63 min                           Max temp was about 218°C                           Glass façade temp were around                                                         27.08 min        Two pairs of glass panel fall out in intact form due to failure of binder.
                                                                                                                                                                                                                   Flashover occurs during this period. Max temp reached
                                                                                                            ambient levels                                                                                  about 800°C(>660°C) which led to melting of frame at certain locations
                                 Video camera stops functioning due to heavy smoke obscuration.
               2.63 min              Flames begin to reach ceiling. ACP sheets begin to shrink.         Temp at first floor level         Temp is about 28.5°C
                                      Max temp at ground floor façade level is about 275°C.                 is about 45.8°C                                                                 28.1 min                Burning of inner insulation polymer of ACP initiates       Max façade temperature is about 400°C
                                   Temperatures become constant at around 250°C for an interval        Heavy smoke obscuration;                                                                                            a small secondary fire at ground level
               5.63 min                  of about 10 minutes and fire does not propagate.           video cameras stop functioning.                                                                                                                                                Fire reaches first floor level and

                                                                                                                                                                                           30.06 min                                                                               chars ACP sheets. Fire could not
               16.46 min           ACP sheet falls due to failure of pressure tape thus increasing     Maximum temperature at                                                                                                                                                    penetrate inside the compartment
                                   the ventilation. Wooden crib placed in the middle catches fire.      first level is about 105°C
                                             Maximum temperature is about 400°C.
                                                                                                                                                                                            33.13 min                           Fire extinguishing begins                            Fire extinguishing begins        Fire extinguishing begins
               24.5 min              Another ACP sheet falls. Max temp reached about 610°C          Temp at first level is about 115°C
                                                                                                                                                                                                                                          Table 8: Timeline of events at all floor levels during fire Test 2
                                            Major failure of structural fire protection.
               24.63 min      During fixing of cement boards, c/c spacing between bolts was about 20'',
                                                which has caused early failure.

                                                                                                         Max temp at this level
               24.63 min              Flames begin to leap out through ventilation opening                                            Temp at this level is about 90°C
                                                                                                            is about 165°C