Page 71 - UL_Report On_Part 1
P. 71

61 IITGN-UL/Façade  62 IITGN-UL/Façade












 18:39:30  Ground floor  First floor  Second floor

 -8.87 min  Data acquisition system is started

 -7.65 min  Ignition of fire through remotely controlled electrical switch

                                      Temperatures reach around 770°C. POP sheets attached
 0 min  Waste papers and accelerators used to ignite fire manually  26.88 min  with deck slab near façade level begin to fail  Temp at this level increased to 220°C


 0.63 min  Max temp was about 218°C  Glass façade temp were around  27.08 min  Two pairs of glass panel fall out in intact form due to failure of binder.
                                      Flashover occurs during this period. Max temp reached
 ambient levels                about 800°C(>660°C) which led to melting of frame at certain locations
 Video camera stops functioning due to heavy smoke obscuration.
 2.63 min  Flames begin to reach ceiling. ACP sheets begin to shrink.  Temp at first floor level  Temp is about 28.5°C
 Max temp at ground floor façade level is about 275°C.  is about 45.8°C  28.1 min  Burning of inner insulation polymer of ACP initiates  Max façade temperature is about 400°C
 Temperatures become constant at around 250°C for an interval  Heavy smoke obscuration;  a small secondary fire at ground level
 5.63 min   of about 10 minutes and fire does not propagate.  video cameras stop functioning.         Fire reaches first floor level and

              30.06 min                                                                               chars ACP sheets. Fire could not
 16.46 min  ACP sheet falls due to failure of pressure tape thus increasing  Maximum temperature at  penetrate inside the compartment
 the ventilation. Wooden crib placed in the middle catches fire.  first level is about 105°C
 Maximum temperature is about 400°C.
               33.13 min                           Fire extinguishing begins                            Fire extinguishing begins        Fire extinguishing begins
 24.5 min  Another ACP sheet falls. Max temp reached about 610°C  Temp at first level is about 115°C
                                                             Table 8: Timeline of events at all floor levels during fire Test 2
 Major failure of structural fire protection.
 24.63 min  During fixing of cement boards, c/c spacing between bolts was about 20'',
 which has caused early failure.

 Max temp at this level
 24.63 min  Flames begin to leap out through ventilation opening  Temp at this level is about 90°C
 is about 165°C
   66   67   68   69   70   71   72   73   74   75   76