Page 74 - UL_Report On_Part 1
P. 74

65 IITGN-UL/Façade                                                                                                                                                           66 IITGN-UL/Façade


                                                                                                                                                                                                                                                                           B                                                                   D
                                                                                                                                                                                                                                                                             2 2 # R 5 8                                          2 2 # R 5 9
                                                                                                                                                                                                                                                                                         2 2 # T R1          2 2 # T L1
          (iii) Test 3: Standard glass + MDF assembly                                                                                                                                 Figure 30 and Figure 31 show locations of                                                                      2 2 # R 7 7
                                                                                                                                                                                      thermocouples at first and second floor levels. Four                       2 2 # R 6 0             2 2 # T R2          2 2 # T L2   2 2 # R 6 1
          This test was performed to study the behavior of assembly of                                                                                                                thermocouples were placed at four roof corners of
          glass panel with another commonly associated cladding                                                                                                                       the compartment at both levels. First floor level had
          material i.e. Medium Density Fiberboard (MDF).  The                                  B                                                                    D                 one  thermocouple beneath cement board near                                                        2 2 # T R3          2 2 # T L3
          performance of façade system of toughened glass and MDF                                1 2 # R 2 4                1 2 # R 3              1 2 # R 2 5                        middle beam. At first floor level, two thermocouple
          was studied by mounting  the whole assembly over  the full                                                                                                                  trees were placed at both ends of  the façade face                                                 2 2 # T R4          2 2 # T L4
          height of test facility through aluminium cladding framework.                                                  1 2 # R 7 4                                                  being  tested, whereas  no  thermocouple  tree was                  3 m              A                     Thermocouple                                  C
                                                                                                                                                                                                                                                                                                 tree
          Construction details of the test are similar to that of Test 2.              1 2 # R 2 6                                        1 2 # R 2 7                                 placed at second floor level.
          Saint Gobain toughened glass of 1200 x 400 mm size and 6                                                    1 2 # T 1
          mm thickness was used. MDF panels of 6mm thickness with                                                                                                                                                                                                                                                                        3 m
          exposed side painted with oil paint color were used. 60% Glass                                              1 2 # T 2
          and 40% MDF was used. Aluminium cladding framework, fire                                                              Thermocouple                                                                                                                                                 6 m
          stop material and installation of MDF and glass panels on the      3 m                              1 2 # 2 9         tree
          cladding are similar to Test 2.                                                      A                      1 2 # T 3                                     C                                                                                               Figure 30: Layout showing location of thermocouples at first floor level for Test 3
          (a) Instrumentation                                                                   1 2 # B 3               1 2 # B 9 4                  1 2 # B 4
          The  test compartment at all  three levels was instrumented                                                 1 2 # T 4                                                                                                                                           B
          with K-type thermocouples (TC), strain gauges, LVDT, video and                                             1 2 # B 4 8                             3 m                                                                                                             3 2 # R 8 4                                          3 2 # R 8 5    D
          thermal imaging cameras. Specifications of instrumentation                  1 2 # B 7                                           1 2 # B 100
          used is similar to that used for Test 1.                                                              6 m
          Ground floor level was instrumented with 14 thermocouples             Figure 29: Layout showing location of thermocouples at ground floor level for Test 3                                                                                              3 2 # R 8 6                                           3 2 # R 8 7
          and one thermocouple tree placed at center of the partition
          wall  to measure  temperature profile across  the height. One
          thermocouple was placed at beam level beneath cement
          board to determine effectiveness of cement board in providing
          fire protection. Another  thermocouple was placed at mid                                                                                                                                                                                       3 m
          height of partition wall where out of plane displacement of                                                                                                                                                                                                    A                                                                      C
          masonry wall was attempted to measure by placing LVDT on
          opposite side of the wall. Figure 29 shows the locations of the

          thermocouples at ground floor level within the compartment                                                                                                                                                                                                                                                                     3 m
          along with  thermocouple  tree. ABCD represents façade face
          being  tested of compartment 2. Nomenclature for                                                                                                                                                                                                                                    6 m
          thermocouples is done in similar fashion as in Tests 1 and 2.
                                                                                                                                                                                                                                                                   Figure 31: Layout showing location of thermocouples at second floor level for Test 3
   69   70   71   72   73   74   75   76   77   78   79