Page 93 - UL_Report On_Part 1
P. 93

83 IITGN-UL/Façade  84 IITGN-UL/Façade






          Ventilation condition


          Initial ventilation was provided through full opening of the ground
          floor (entrance) fire door of dimensions 1m x 2.2m at ground floor.
          No initial ventilation was provided at first and second floor levels.
          Shattering of glass panels during the fire progress increased the
          ventilation conditions, as shown in Figure 36.wood members of size
          38mm x 38mm x 750mm arranged in alternate layers at right
          angles (18 layers of 8) was placed outside test compartment close
          to the ventilation provided in the façade assembly in order to allow

 THE PLACEMENT OF WOODEN CRIBS  easy propagation of fire from crib to the façade assembly and then
          within the compartment.
          Stainless steel plate of 33cm diameter filled up  to 1.15 cm with
 AT ALL THREE LEVELS CAN BE SEEN  gasoline placed beneath the crib was used as an ignition source.
          Density of gasoline is 719.7 kg/m3 while its calorific value of is 45.8
 IN THE FOLLOWING IMAGES.  MJ/kg. Using these values, the fire load used as ignition source was   Figure 36: Variation of ventilation factor w.r.t time at all floor levels for Test 4

          32.4 MJ



                                                                                Ignition Source

                                                                                Stainless steel dish of 33 cm diameter filled up to 1.15 cm with gasoline placed beneath
                                                                                the wooden crib at ground floor was used as an ignition source.
                                                                                Density of Gasoline = 719.7 kg/m3and calorific value of Gasoline is 45.8 MJ/kg. Using
                                                                                these values, fire load used as ignition source = 32.4 MJ
















 Image 30: Fire load scenario at ground floor  Image 31: Fire load scenario at first floor  Image 32: Fire load scenario at second floor
  level for Test 4 (8 kg w.eq.)   level for Test 4 (8 kg w.eq.)   level for Test 4 (6 kg w. eq.)
   88   89   90   91   92   93   94   95   96   97   98