"Oil-Less” Medical Air                                                              Medical Systems


               3.0 System Operation


               3.1 Prestart-up

               The contractor should notify BeaconMedæs two weeks prior to start-up date to schedule an appointment for an
               authorized technician to review the installation prior to start-up.

               CAUTION:  Failure to install the unit properly and have a BeaconMedæs authorized technician start-up the
               system can void the manufacturer’s warranties.

                                                         WARNING:
                                            ®
                  Prior to putting the LifeLine  Medical Air system into use, the medical facility must have a Certifier
                perform all installation tests as specified in NFPA 99.  The medical facility is also responsible for ensuring
                     that the medical air meets the minimum requirements for medical air as specified in NFPA 99.

               Prestart-up and start-up procedures should be performed for a new installation or when major maintenance has
               been performed.

                                                         WARNING:
                Have more than one person on hand during prestart-up and start-up procedures to ensure safety and to
                                                    facilitate certain checks.

               The main power source to the control panel should be OFF for the duration of the visual inspection.

               Ensure that the equipment is installed on a solid level surface. Walk around the system to ensure that there is
               enough clearance on all sides to perform operational checks/actions and maintenance. The temperature of the
               area containing the modules should be approximately 70°F (21.1°C) with a minimum ambient temperature of
               40°F (4.4°C) and a maximum ambient temperature of 100°F (37.7°C).

               Check the inlet piping for proper size and connection to the compressor modules. Refer to section 2.5 in this
               manual.

               Check all piping system joints that might have come loose during shipment and installation to ensure they are
               tight.

               Check the air receiver, control module, and compressors for damage.

               Check the drain valves on the air receiver and compressor modules.

               Check all valves for full open and full close travel. Ensure that the systems valves are positioned for proper
               operation.  (Refer to labeling on valve handles.)

               Remove the orange shipping blocks from each  compressor module if base mounted and from the
               compressor/motor base if tank mounted.

               Check the electrical cabinet on the control module.