MEDICAL MANIFOLD SYSTEM ANNUAL INSPECTION FORM


          Facility   Florida Hospital Orlando Med Plaza   Technician   Anthony Voight
          City/State          Orlando, FL             Date          12-12-17
          System Inspected    N2O Manifold            Floor/Bldg    Loading dock

          Manufacturer        Amico                   Equipment ID #     GM-P-5PC-01-NO-E-07
          Model#              M2HD-DHHH-U-N2O         Serial #           20091202-P-A
          Manifold Type       HP                      Gas Type           N2O
          Primary Cylinders   4            Secondary Cylinders   4           Reserve Cylinders   -

                  Is Manifold System located IAW NFPA 99 (Dedicated Enclosure, Adequately Ventilated, with Required Utilities, Minimum 1-
           YES    HR Fire Rated, Electrical Devices located at or above 5 ft)
           YES    Is Manifold System Fed from Emergency Power (Essential Electrical System)
           YES    Is the Manifold Enclosure free of any Flammable Materials, Liquids or Gases
           YES    Are all Gas Cylinders (Full, Empty, Connected or unconnected) Secured to prevent them from falling

           YES    Is the Manifold Enclosure Secured and properly labeled IAW NFPA 99
                  Does the Manifold System consist of at least (2) Two Banks of Cylinders/Containers each capable of supplying an average
           YES    days supply of gas  IAW NFPA 99
           YES    Does Each Bank/Header of Cylinders/Containers have an Isolation Valve
           YES    Does each Cylinder/Container Connection on the Header have a Check Valve to prevent backflow

           YES    Does each Bank/Header of Cylinders have a Pressure Gauge to indicate Header Contents
           YES    Does each Bank/Header have a Primary/Bank Regulator
           YES    Are there Check Valves installed between Primary/Bank Regulators and Final Line Regulators

           YES    Are Gas Cylinders/Containers prevented from exposure to Temperatures above 130 F
           YES    Does the Manifold have Duplex Final Line Regulators
           YES    Does the Manifold have the Pressure Relief Valves Required IAW NFPA 99

           YES    Are the Pressure Relief Valves Vented to the Outside IAW NFPA 99
           YES    Does the Manifold provide an Automatic Means for the Secondary Supply to Supply the System (Switchover)
           YES    Is the Manifold System Equipped with a Source Shut Off Valve & Labeled Properly

           YES    Are the Local Alarms Required By NFPA 99 Present, Functioning and connected to the Master Alarms as required
          Comments:



              Corporate Office ∙ 4518 Clements Rd. Lakeland Florida 33811 Phone: 863-646-7555 ∙ Fax 863-646-2999
                                 “Medical Gas Pipeline Equipment Service, Sales & Verifications”
                                                     www.medgaspro.org
   11   12   13   14   15   16   17   18   19   20   21