Page 852 - Med Plaza and Cancer Center
P. 852
PROPRIETARY AND CONFIDENTIAL DRAFT 28/Feb/03
4.20 Remote-Mount Transducer and Demand Flow Valve Assembly
Chapter 4: Removal, Replacement, and Adjustment Procedures
12. Check for leaks in the gas connections.
13. If there are leaks, repeat step 2 through step 11.
14. To ensure proper operation, perform the “Function Checks” on page 2-5.
4
MedPlus TotalAlert™ Alarm Network Operation and Maintenance Manual (man291ra) Page 4 - 53