Page 852 - Med Plaza and Cancer Center
P. 852

PROPRIETARY AND CONFIDENTIAL DRAFT 28/Feb/03

                                            4.20  Remote-Mount Transducer and Demand Flow Valve Assembly
                                                Chapter 4: Removal, Replacement, and Adjustment Procedures

                              12. Check for leaks in the gas connections.

                              13. If there are leaks, repeat step 2 through step 11.


                              14. To ensure proper operation, perform the “Function Checks” on page 2-5.




























                                                                                                                 4











































               MedPlus TotalAlert™ Alarm Network Operation and Maintenance Manual (man291ra)    Page 4 - 53
   847   848   849   850   851   852   853   854   855   856   857